
{"id":3715,"date":"2019-06-08T21:12:08","date_gmt":"2019-06-08T21:12:08","guid":{"rendered":"https:\/\/www.gity.cz\/sluzby\/electromobility\/"},"modified":"2020-03-02T22:15:05","modified_gmt":"2020-03-02T22:15:05","slug":"electromobility","status":"publish","type":"services","link":"https:\/\/www.gity.cz\/en\/sluzby\/electromobility\/","title":{"rendered":"Electromobility"},"content":{"rendered":"\n<div class=\"wp-block-gity-tabs Tabs\"><div class=\"Tabs-nav\"><\/div><div class=\"Tabs-wrap\">\n<div class=\"wp-block-gity-tab\"><button class=\"Tabs-title\">Co nab\u00edz\u00edme?<\/button><div class=\"Tabs-body\">\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 15%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"180\" height=\"160\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2020\/03\/whitebox.png\" alt=\"\" class=\"wp-image-3716\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2020\/03\/whitebox.png 180w, https:\/\/www.gity.cz\/wp-content\/uploads\/2020\/03\/whitebox-150x133.png 150w\" sizes=\"auto, (max-width: 180px) 100vw, 180px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p style=\"color:#22a479\" class=\"has-text-color\">The world&#8217;s&nbsp;largest automakers, governments, city governments and other organizations already support electric cars en masse, and it is only a&nbsp;matter of time before they are deployed en masse. Gity offers complete planning and implementation of electric infrastructure, especially charging stations. Whether you&#8217;re running a&nbsp;petrol station, office complex or hotel, investing in electromobility is preparing for the future.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The design and implementation of this infrastructure requires the following steps.<\/h3>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide\" style=\"grid-template-columns:19% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/audit.png\" alt=\"\" class=\"wp-image-3618\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/audit.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/audit-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\" id=\"mce_12\">Complete electrical connection audit<\/h2>\n\n\n\n<p>The installation of charging stations in the first place requires <mark>a thorough audit of the electrical connection<\/mark> and an estimate of performance reserves. We are therefore auditing to make full use of the potentialof the existing connection during installation to speed up work and reduce costs. <\/p>\n\n\n\n<p>Finally, <mark>we will propose the necessary adjustment of the current value of<\/mark> the connection to the electricity distribution network and we will be happy to resolve all requests to the distributor.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 18%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/e-management.png\" alt=\"\" class=\"wp-image-3620\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/e-management.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/e-management-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\" id=\"mce_5\">Energy management<\/h2>\n\n\n\n<p>If you plan to install multiple charging stations within a&nbsp;single campus, you can also count on our superstructure system for static or dynamic control over their power consumption. <\/p>\n\n\n\n<p>This will allow you to prioritize a&nbsp;specific station or a&nbsp;specific user. In addition, the superstructure system offers a&nbsp;variety of additional settings and parameters that can be read from charging stations (consumption, average charging length, power consumption&#8230;).<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide\" style=\"grid-template-columns:20% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/zarovka.png\" alt=\"\" class=\"wp-image-3614\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/zarovka.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/zarovka-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We will propose tailor-made solutions<\/h2>\n\n\n\n<p>After discussion with the customer and after finding out his needs, we will propose the most suitable solution for <mark>the installation of charging stations<\/mark>, of course taking into account existing or planned infrastructure.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 19%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/dobijecka.png\" alt=\"\" class=\"wp-image-3604\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/dobijecka.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/dobijecka-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We select the most suitable chargeers<\/h2>\n\n\n\n<p>We offer <mark>rechargeable stations from 3.6kW to 50kW<\/mark>. We are a&nbsp;system integrator of solutions of different suppliers of electric vehicle charging technology and we expect that each campus and each implementation will have specific requirements. The pros and cons of different solutions are always discussed in advance with the customer.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide\" style=\"grid-template-columns:19% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/karta.png\" alt=\"\" class=\"wp-image-3608\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/karta.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/karta-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We install payment methods<\/h2>\n\n\n\n<p>We can complement the charging station <mark>with an RFID card reader and a&nbsp;payment terminal<\/mark>.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 20%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/regulace.png\" alt=\"\" class=\"wp-image-3612\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/regulace.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/regulace-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We set the power control<\/h2>\n\n\n\n<p>If necessary, we offer the installation of a&nbsp;&#8220;smart&#8221; meter, which through its communication interface controls the entire charging station system, i.e. the system of charging stations. can <mark>regulate the current power of stations according to the current collection of the whole building<\/mark>or its chosen part.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide\" style=\"grid-template-columns:21% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/baterka.png\" alt=\"\" class=\"wp-image-3602\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/baterka.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/baterka-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We arrange photovoltaics or batteries<\/h2>\n\n\n\n<p>Some solutions can be supplemented with <mark>battery storage or photovoltaic panels<\/mark> in case the customer does not want or cannot increase the current value of the connection to the electrical distribution network and needs immediate high performance of charging stations. These solutions are not only potentially greener, but also serve as quality backups in case of high interest in charging stations.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 21%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/docs.png\" alt=\"\" class=\"wp-image-3606\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/docs.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/docs-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We will provide the necessary documentation<\/h2>\n\n\n\n<p>We will process <mark>project documentation<\/mark> for the installation of charging stations in all necessary documentation stages in accordance with <mark>Decree 499\/2006 Coll.<\/mark><\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide\" style=\"grid-template-columns:20% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/partnerstvi.png\" alt=\"\" class=\"wp-image-3610\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/partnerstvi.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/partnerstvi-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We realize turnkey<\/h2>\n\n\n\n<p>We will provide the entire process of installing charging stations <mark>from the project part to the implementation of<\/mark>the default revision , commissioning and training of equipment operation.<\/p>\n<\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-dots\" \/>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right\" style=\"grid-template-columns:auto 21%\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"227\" height=\"222\" src=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/technik.png\" alt=\"\" class=\"wp-image-3616\" srcset=\"https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/technik.png 227w, https:\/\/www.gity.cz\/wp-content\/uploads\/2019\/06\/technik-150x147.png 150w\" sizes=\"auto, (max-width: 227px) 100vw, 227px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<h2 class=\"wp-block-heading\">We provide service<\/h2>\n\n\n\n<p>As part of the following services, we offer <mark>a service contract for possible checks or interventions in the superstructure system<\/mark>. Commissioning and subsequent service are carried out by fully trained technical personnel.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Do you need a&nbsp;solution to the electric cellphone charging station?<\/p>\n","protected":false},"featured_media":3409,"template":"","tags":[],"service_category":[55],"class_list":["post-3715","services","type-services","status-publish","has-post-thumbnail","hentry","service_category-circuitry"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/services\/3715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/services"}],"about":[{"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/types\/services"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/media\/3409"}],"wp:attachment":[{"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/media?parent=3715"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/tags?post=3715"},{"taxonomy":"service_category","embeddable":true,"href":"https:\/\/www.gity.cz\/en\/wp-json\/wp\/v2\/service_category?post=3715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}